My knitting fears, hopes, dreams, and what comes of them.

Showing posts with label plans. Show all posts
Showing posts with label plans. Show all posts

Monday, April 21, 2008

Nothing New

So... I've been teh suck at both knitting AND updating lately. I still owe y'all pictures from my swap, as well as an update on my afghan (it's HUGE!!) and the socks I'm making from my pebble beach yarn. I haven't had much time to knit lately, and I have a couple of things I have to finish before I can get wrapped up in my knitting again. However, the semester is over in four weeks and without internet access all summer, I will knit a ton. A shit ton, even.

Knitting goals:

  • Finish scarf
  • Finish afghan
  • Start clapotis
  • Finish second sock
  • Start yellephant for Becky
  • Lots of other things.
That will occupy me for a while. Pics when I'm not being a bum!

~Kero

Saturday, January 19, 2008

Winter Break FOs

Hello!! Here are some FOs, as promised.

I'll start off with the hats. The first hat was knit as a Christmas present for my dad. The pattern is the New York Hat. I used US #6 needles and Caron Simply Soft in Dark Country Blue. Dad really seems to like the hat. He wore it all day after I gave it to him, and has had it one every time I've seen him outside.



Next is a hat I knit for a friend, Brandon, as a wedding present. This hat is called 1337 Hat Redux, and was my first attempt at intarsia. I like the way it came out! This hat is actually two hats knit together at the brim, and then the plain one is stuffed inside the decorated hat as a liner. I used Caron Simply Soft yarn in Black and Lemonade on US #7 needles.





The project I'm the proudest has to be the socks. I call them my Johnny Socks, because after I turned the heel of the first sock I declared that its name was Johnathan (I name everything!!). I knitted these socks in about a week, and they fit like a dream! I am very pleased that my first socks turned out so well. It's hard to tell, but thet have a cabled pattern. The yarn is Brown Sheep Wildfoote Luxury Sock Yarn in Elderberry. I used four US #2 DPNs.





And last but not least, here is the yarn that I hand-painted over the holidays. There's about 450 yards of worsted weight silk yarn there, and I'm planning on knitting a hat and wrist warmer set. I call the colorway Silkberry because I can't think of anything better.





And that's all for now! I have one hat in the works, I ordered the yarn for my afghan today, I'm getting ready to start a scarf, and I'm contributing a square for the Terry Pratchett Afghan (or "Pratchgan"). Busy busy busy! And to think, school starts in a few days!

~Kero

Saturday, December 8, 2007

Another LYS Trip...

Becky, Valerie, Justin, and I went to our LYS yesterday! Much fun. We bought Valerie a birthday present (some beautiful lace weight yarn. She's making a gift for her host mom when she goes to Japan). Becky found some of her favorite yarn on sale, the book she's been wanting, and she bought me some crazy cool novelty yarn that I'm making a headband with. Pics to follow.

ALSO!! I got compliments on my calorimetry TWICE yesterday. Once was from a random girl on campus that stopped Becky and asked, "Where did you buy that?" and the other was the other of the yarn shop who thought it was amazing and had to look up the pattern for herself. Squee.

We're going back to the store today for Becky's b-day present. I found the yarn I want to make my afghan out of, but it's $10 a skein and I need over ten skeins. :( Not in the budget right now. I wish I could buy it one skein at a time, but then my dye lots wouldn't match. Anywho, I do need to go back to Wal-Mart and grab a few skeins of Caron Simply Soft to make my dad's hat and Kelly's hat.

One last thing! The person I made the Jayne hat for received it yesterday and LOVES it! I am sooo happy!
~Kero

Wednesday, December 5, 2007

Change Your Mind

Well, I decided that the pithy hat was not turning out like I had hoped, so I frogged it. Instead, I cast on the Blanche hat. I'm already finished! It was a really quick knit. It's also very lovely. This was made to match the star scarf, and I'll try and get picture of it and the set up tomorrow. I have also promised to help Becky update her blog, so hopefully I can be productive.

I've decided to hold off on the butterfly scarf and finish all my other gifts first. If I don't get it all done by Christmas, everyone will at LEAST get one gift and then I can give them the second part as I finish.

Next thing to do: Find a hat to match my Wavy scarf.

Oh, and btw.... I bought sock yarn!! Now if only Becky will finish her pair of socks so that I can steal the needles. ^_^
~Kero

Wednesday, November 28, 2007

To-Do List

I just want to keep track of where I'm at project-wise. Right now the only thing I have on needles is Becky's scarf, so I can start a few more projects.

Hats:

  • Black calorimetry for Christen
  • Blue butterfly hat for myself
  • Wavy hat for Kelly
  • Pithy hat for Eilene
  • Sock hat for my dad
Scarves:
  • Finish skull scarf for Becky
  • Butterfly scarf for Casey
  • Ribbed scarf
Other:
  • Afghan for me
  • Towel toppers for my grandma
Not too bad, I guess... Only six of these need to be done by Christmas, so I have right around 25 days to finish everything up. That's about 4 days per thing, and the calorimetry will only take one day. I should probably start the butterfly scarf first, because I think that will take the longest.

...I think I'm going to go get started. ^^;;;;; Wish me luck!
~Kero